Important Requirments
- Authorized Connections Only: No water connection will be made to the Ridgeview Estates water system without an approved water meter.
- Account Status: HOA dues must be current in order for the water meter installation to be completed.
- Installation: All meters must be installed by—or under the direction of—the Ridgeview Estates Water System Operator.
- Submission: This form is required for submitting all requests for water meter installations and/or site evaluations.
Fees & Cost Structure
- Standard Deposit: $2,500 must be received by Ridgeview Estates before work commences. Includes: Water meter, boxes, necessary components, and up to 10 hours of labor.
- Additional Labor: Installations exceeding 10 hours of labor will be billed to the lot owner at a rate of $50 per additional hour.
Process & Next Steps
- Application & Scheduling: Once your form is submitted, the HOA Board will contact the Water System Operator to schedule the date and time of the work.
- Invoicing: An invoice will be emailed to you after submitting this form. Work will commence only after full payment is received and all delinquent HOA dues are paid in full.
Payment Options
Payments can be made via electronic payment, check, or Bank Bill Pay.
- Electronic Payment: Note: A 3% processing fee applies to all electronic payments and is expected to be paid along with the invoice.
- Check or Bank Bill Pay:
Checks can be mailed to:
Ridgeview Estates Homeowners Association
39600 Sun Ridge N.
Davenport, WA 99122
Water Meter Installation Form
This form is required for installing all water meter installations
